KIM ROMERO 19 years of
experience in construction management, project and program scheduling, and
project cost and schedule controls. As a Sr. Scheduler, Mr. Romero has
prepared resource- and cost-loaded master program and project-specific
schedules for College and K-12 educational new construction buildings and
facilities, new sewer, water and wastewater treatment plants, port &
harbor civil projects, recreational facilities, TBM tunneling and military
housing facilities. Kim is also experienced in review of contractors’
baseline and monthly schedule updates, evaluation of contractors’ requests
for time extension, status reporting, funding allocation monitoring,
forecasting, and earn value analysis, and preparation of owner parallel
schedules. Kim is a certified Primavera user and is proficient in the use and
review of state of the art scheduling software packages including Primavera
P6 version 8.2, P3, Suretrak, Contractor and Microsoft Project. He has
successfully completed projects with private, local, state and federal
government owners including Port of Los Angeles, Port of Long Beach,
Department of Water & Power, Los Angeles Unified School District, Los
Angeles Community College District, City of Los Angeles Bureaus of
Engineering, Disney Resort, Metropolitan Water District, and Army Corps of
Engineers. Mr. Romero has provided scheduling for both Owner and Contractor. Design - Build
EXPO 2 Light Rail Transit Phase 2,
Skanska/Rados
SENIOR
SCHEDULER CONSULTANT Date: June 2014 to October 2014 Mr. Romero is
currently serving as the Senior Scheduler Consultant for the Design - Build
EXPO 2 Light Rail Transit Phase 2 project with a budget of 580 million
dollars for 3 months assignment. The project consists of constructing 6.5
miles and 7 stations of Light Rail transit from the end of Expo 1 to the City
of Santa Monica. Mr. Romero will be providing training, monitor, maintaining
and make recommendations to the current schedule. Analyze Time Impact
Analysis of the electrical subcontractors and fragnets schedule. Caltrans CMGC
Pilot Program for Selected
Projects
SENIOR
SCHEDULER CONSULTANT Date: May 2014 to Present Mr. Romero is
currently serving as the Senior Scheduler for the Caltrans CMGC Pilot
Program. The Caltrans CMGC Pilot program includes 6 distinguish projects with
approx. budget of 110 billion dollars. Mr. Romero is involved with Independent
Cost Estimate team (ICE) to provide scheduling services for the
projects. The Caltrans CMGC projects consists of the following design
build and construction projects: ·
Oakland Bay
Bridge Marine Foundation Removal ·
Realign
Route 99 to Accommodate High Speed Rail (Fresno) ·
State Route
58 Convert 7.5 Miles 2- Lane Highway to 4- Lane Expressway ·
Reconstruction
of Barton Road at Interchange 215 Freeway ·
Ferguson
Slide Restoration Construction of 2 - Lane Highway on New Alignment at
Yosemite ·
Interstate
5 North Coast Corridor Improvements consisting of 27 Miles in San Diego
County South
Wilmington Grade Separation, Port of Los Angeles,
CA
SENIOR
SCHEDULER CONSULTANT Date: December 2013 to Present Mr. Romero is
currently serving as the Senior Scheduler for the Port of Los Angeles – South
Wilmington Grade Separation with a budget of 50.6 million. The project
consist of constructing an approximately 4,100 foot long grade separation
South Wilmington extending from the Trapac Terminal South of Harbor Bridges
Boulevard near the intersection of Lagoon Avenue to Pier A Street West of the
intersection with Fries Avenue. The project will include demolition and
removals; asbestos abatement; constructing approaches, abutments, slopes,
retaining walls and mechanically stabilized embankment (MSE) walls; driving
precast/pre-stressed concrete piles, placing footings on top of piles,
add 7 foot diameter column piles on top of footings; constructing viaduct; constructing
storm drain systems; relocating of sewer and water lines; install street
lighting; installing traffic signals; install steel casings; installing
landscape planting and irrigation. Kim is presently providing schedule
services for the project, Kim will be reviewing the contractor’s baseline and
monthly schedule updates, preparing owner’s parallel schedules, monitoring
the Contractors progress and comparing it to the latest approved
schedule. Kim will be preparing the response to the Contractor
monthly written reports. Kim will also attends weekly progress meetings,
verifies the three-week look-ahead schedules and compares them with the
latest baseline and monthly schedule updates provided by the Contractor.
Reviewing of the Contractor Time Impact Analysis fragnet schedules pertaining
to contractor stated delay. Anaheim Street
Improvements, Port of Long Beach,
CA
SENIOR
SCHEDULER CONSULTANT Date: August
2013 to December 2014 Mr. Romero is
currently serving as the Senior Scheduler for the Port of Long Beach –
Anaheim Street Improvements with a budget of $ 9.6 million. This project
consists of demolition, removals and re-install for project improvements
which will include concrete curbs, gutters, slabs, asphalt concrete, PCC
pavement, base material, curb ramps, sidewalks, driveways, landscaping and
traffic signals. The project will also include grading, earthwork , providing
CMB material on site, utilities relocations, modifications to the traffic
signals, irrigation and landscaping. Mr. Romero responsible for reviewing the
contractor’s baseline and monthly schedule updates, monitoring the
contractor’s progress and comparing it to the latest approved schedule and
preparing written reports. He also attends weekly progress meetings, verifies
the three-week look-ahead schedules and compares them with the latest
baseline and monthly schedule updates. Berths B84-B87
Tesoro Facility Improvements, Port of Long Beach,
CA
SENIOR
SCHEDULER CONSULTANT Date: August 2013 to February 2014 Mr. Romero is
currently serving as the Senior Scheduler for the Port of Long Beach – Berths
B84 – B87 Tesoro Facility Improvements with a budget of 4.8 million. The
project consists of demolition &, removal of partial marine structures,
demolition & removal of partial fendering system, construct new fendering
system, repair pre-stressed piles with FRP wrap, repair under deck and top
deck concrete spalls , concrete repairs to seal product leakage and construct
of new access bridges. Mr. Romero is responsible for reviewing the
contractor’s baseline and monthly schedule updates, monitoring the
contractor’s progress and comparing it to the latest approved schedule and
preparing written reports. He also attends weekly progress meetings, verifies
the three-week look-ahead schedules and compares them with the latest
baseline and monthly schedule updates.
Los Angeles
Mission College, Sylmar,
CA
INTERIM PROJECTS CONTROLS MANAGER CONSULTANT Date: April 1, 2013 – October, 2013 As a Project
Controls Manager, Mr. Romero is managing the budgets and construction
schedules for various projects budgets that total $ 450 million for Los
Angeles Mission College. The projects include design-bid-build and
design-build contracts for new construction and modernization/renovation
projects from NTP through Commissioning and Closeout. He is responsible for
creating, updating,
monitoring of budgets and schedules for Los Angeles Mission College master
schedule, assisting the construction managers in placing their project
schedules on the District dashboard for their monthly reports, reviewing the
contractors’ baseline schedules for conformance with the schedule
specification, monitoring contractors’ daily progress, reviewing and
monitoring contractors’ monthly schedule updates, tracking project costs,
preparing owner’s Time Impact Analysis and reviewing the contractors requests
for time extensions, preparing cash flow projections and preparing schedule
reports. Kim also monitors submittals, RFI's, long lead procurements and
field orders that might impact the schedule. Berth 102 –
Rear Backland Development, Port of Los Angeles, CA SENIOR
SCHEDULER CONSULTANT Date: Jan 2013 to February 2014 Mr. Romero had
been serving as the Senior Scheduler for the Port of Los Angeles’ Berth 102 –
Rear Backland Development with a budget of $ 29 million. This project
consists of constructing 27 acres backland, which includes reinforced
portland cement concrete paving and trainstainer runways; asphalt concrete
paving; crushed miscellaneous base; grading; sewer system including
boring and jacking under railroad tracks and dewatering; gas distribution system
including boring and jackind under the railroad tracks; storm drain system
including dewatering; electrical, telephone and communications systems,
including electric rubber tire gantry (ERTG) infrastructure; striping,
fencing and fencing on K-rails. Kim is responsible for reviewing the
contractor’s baseline and monthly schedule updates, preparing owner’s
parallel schedule, monitoring the contractor’s progress and comparing it to
the latest approved schedule and preparing written reports. Kim also attends
weekly progress meetings, verifies the three-week look-ahead schedules and
compares them with the latest baseline and monthly schedule updates. Review
of the contractor Time Impact Analysis fragnet schedule. Berth 100 –
Wharf South Extension & Backland Development, Port of Los Angeles, CA SENIOR
SCHEDULER CONSULTANT Date: July 2012 to December 2013 Mr. Romero had
been serving as the Senior Scheduler for the Port of Los Angeles’ Berth 100 –
Wharf South Extension with a budget & $ 33 million. This project consists
of construction of a reinforced concrete container wharf and backland area.
The scope of work also includes construction of a rock dike and engineered
fill requiring the installation of wick drains, both underwater and on land,
a surcharge with instrumentation installation and monitoring and paving. Kim
is responsible for reviewing the contractor’s baseline and monthly schedule
updates, preparing owner’s parallel schedule, monitoring the contractor’s
progress and comparing it to the latest approved schedule and preparing
written reports. Kim also attends weekly progress meetings, verifies the
three-week look-ahead schedules and compares them with the latest baseline
and monthly schedule updates. Ultraviolet
(UV) Filtration Facility, Los Angeles Department of Water & Power,
Sylmar, CA SENIOR
SCHEDULER CONSULTANT Date: July 2012-August 2013 Kim Romero provided scheduling services for the design and
construction of a new Ultraviolet (UV) Filtration Facility with a budget of $
66 million, which is the biggest filtration facility West of the Mississippi.
This project is being constructed with the DWP construction workforce. Mr.
Romero’s responsibilities include developing and updating detailed
resource-loaded project schedule, working with DWP Construction team to
optimize schedule and sequencing of activities, equipment staging, resource
planning, procurement activities, and working with Consultant design team to
develop 4-D (NavisWorks) model. Kim provides recommendations for schedule
optimization, which is required due to critical project completion
date.
Los Angeles Unified School District, Porter
Ranch, CA SENIOR SCHEDULER CONSULTANT Date: October 15, 2010 – July, 2012 Mr. Romero
provided scheduling services to the Los Angeles Unified School District
Valley Region Span K8 #2 Porter for construction of seven different buildings
totaling 55,000 square feet with a value of $33 million. He was responsible
for reviewing the contractor’s baseline and monthly schedule updates,
preparing owner’s parallel schedule, monitoring the contractor’s progress and
comparing it to the latest approved schedule, reviewing and reporting on the
contractors Time Impact Analysis fragnet schedules, and preparing written
reports. He conducted daily job walks to monitor the contractor’s progress of
work and updated the Owner’s parallel schedule based on the weekly job walks.
Kim also attended weekly progress meetings, verified the three-week
look-ahead schedules and compared them with the monthly schedule updates.
Los Angeles Mission College, Sylmar,
CA
SENIOR SCHEDULER CONSULTANT Date: December 20, 2008 – October, 2013 As a Senior
Scheduler, Mr. Romero is manage the construction schedule for a 30,000 SF and
$42 million Health and PE Fitness Center, a 25,000 SF and $47 million Family
Consumer Studies Building, a 38,000 SF and $77 million East Campus Science
Building, a 22,000 SF and $18 million Media Arts Building, and campus wide
modernization and renovation projects totaling $15 million for Los Angeles
Mission College. The projects include design-bid-build and design-build
contracts for new construction and modernization/renovation projects from NTP
through Commissioning and Closeout. He is responsible for creating, updating
and monitoring the Los Angeles Mission College master schedule, assisting the
construction managers in placing their project schedules on the District
dashboard for their monthly reports, reviewing the contractors’ baseline
schedules for conformance with the schedule specification, monitoring
contractors’ daily progress, reviewing and monitoring contractors’ monthly
schedule updates, tracking project costs, preparing owner’s Time Impact
Analysis and reviewing the contractors requests for time extensions,
preparing cash flow projections and preparing schedule reports. Kim also
monitors submittals, RFI's, long lead procurements and field orders that
might impact the schedule. City of Los
Angeles Bureau of Engineering (LABOE), Los Angeles, CA SENIOR SCHEDULER Consultant Date: May 2005- February 2008 Kim provided
scheduling services to LABOE for Lower North Outfall Sewer Rehab Project
valued at $67 million. This project involved sewer renovation which consisted
of bulk cleaning, pressure washing, excavation of shafts, cast-in-place
concrete, and soil injection grouting. Responsibilities included reviewing
baseline schedule and monthly schedule updates for conformance to the
scheduling specifications; evaluating progress of construction; verifying
actual start and finish dates; verifying individual activity durations and
sequencing through reconciliation with the inspector’s daily logs; and
preparing written schedule analysis reports. He monitored activities that
might have interfered with third parties and provided schedule update
information at the weekly jobsite meeting, and also prepared owners Time
Impact Analysis fragnet schedules.
Disney Project Management, Anaheim, CA
SCHEDULER CONSULTANT Date: November 2004 - May 2005 In this role,
Mr. Romero was reviewing monthly schedules for Steam Train Ride upgrades,
Storefront upgrades, Tiki Room Renovation, Jungle Cruise upgrades and Splash
Mountain rail upgrades at Disneyland Resort for the 50th Anniversary
milestone. This effort included preparing written comments and
recommendations; reviewing contractor construction schedules for conformity
to the specifications, durations, activity logics, and critical activities;
reviewing actual construction progress; attend weekly progress meetings to
provide information to the project managers and the construction manager
regarding progress and schedule issues. He also created what if schedule
analysis due to delays to late submittals, RFI’s and long lead procurement
for this project. U.S. Army Corp
of Engineers Los Angeles District, Los Angeles, CA SCHEDULER Date: April 2004 - November 2004 Mr. Romero was
assigned to multiple civil and military facility projects, including
waterways, dams, streams, channels, barracks, mess halls, and military
housing valued at over $200 million. In providing scheduling support through
all project development phases, he developed the project cost and schedule
baselines, established resource loading based on detailed work scope,
identified variances, monitored and updated the cost and schedule status, and
provided monthly reporting. He oversaw a staff of four project control
specialists and provided Primavera schedule training to USACE staff. Los Angeles
Unified School District – District A, Los Angeles, CA OWNER
AUTHORIZED REPRESENTATIVE Date: August 2004 - October 2004 Kim was Owner
Authorized Representative for the renovation and modernization of 4
elementary schools. For this over $200 million project, Kim managed the
preparation of bid documents, conducting Job-Start meetings, monitoring
contractor’s schedule of values, and developing summary construction
schedules and cash flow diagrams. He also maintained information in
Expedition, including RFI’s, RFP’s, Submittals and Change Orders; processed
contractor payment applications; monitored cost and schedule status; and
conducted weekly progress meetings and job site visits. He was certified as
an OAR through the LAUSD training program. Chevron Commercial Projects, Los Angeles, CA Contract
SCHEDULER Date: May 2004 - October 2004 Mr. Romero
responsibilities included the EPC baseline planning, scheduling updates,
monthly forecasting, cost performance reporting, forecasting project
cost-at-completion, attending weekly project meetings, and providing progress
reporting information to Chevron on this project that valued at $50
million. Hacienda La Puente Unified School District, City of Industry, CA SCHEDULER/DOCUMENT
CONTROLS MANAGER Date: November 2003- June 2004 Mr. Kim Romero
was Document Controls Manager/Scheduler for the renovation and modernization
of four elementary schools at Hacienda La Puente Unified School District
totaling $125 million. He processed and logged RFI’s, RFP’s, Submittals and
Change Orders into Prolog. He provided cost and schedule analysis to Project
Managers, and reviewed cost and schedule performance baselines against
schedule updates. Kim also provided cost and schedule reporting to the
construction managers, and oversaw a staff of 4 document controls engineers. City of Los
Angeles Department of Public Works, Los Angeles, CA SCHEDULER February 2001- November 2003 Mr. Romero was
assigned to the construction of East Central Interceptor Sewer Tunnel Project
which was 10 miles long, which consisted using 4 TBM tunneling equipment and
with valued at $265 million. His services included reviewing baseline
schedules and monthly schedule updates for conformance to the contract requirements;
evaluating progress; verifying actual start and finish dates;
verifying individual activity durations and sequencing through reconciliation
with the inspector’s daily log; identifying critical and sub-critical
activities; and reviewing the contractor’s plan to mitigate delays. He also
reviewed activities that might have interfaced with third parties and
provided schedule update information at the weekly jobsite meeting. Kim also
prepared Time Impact Analysis and reviewed contractors’ requests for time
extensions. Los Angeles
Unified School District SCHEDULER As a
Scheduler, Kim was responsible for consulting with the LAUSD consultant 3DI
on cost control and scheduling issues. He provided review and analysis for
performance against established baselines vs. the schedule update and
prepared monthly progress updates to LAUSD under BB Bond Program. Los Angeles
Police Department, Los Angeles and Valley 911 Center SCHEDULER Kim provided cost
control and scheduling services for the construction of 911 facilities valued
at $22 million. Responsibilities included review and analysis of baseline
cost and schedule in comparison to the forecasts, prepare monthly progress
reports to LAPD, and review monthly invoices. He attended the City of
Los Angeles’ monthly technical steering committee meetings to report on
project schedule and cost status. Metropolitan
Water District SCHEDULER Mr. Romero
served as scheduler for over $100 million Metropolitan Water District’s dam
renovations at Inland Feeder and San Diego 6. He developed and maintained
construction cost and schedule information at all project phases. Kim was
responsible for cost loading the schedules, monitoring costs, manpower
analysis, performance measurement analysis, resource analysis, overhead and
escalation rates, and implementing requirements to establish performance
against baselines. He also prepared weekly and monthly schedules, performed
cost analysis, and prepared reports. North Island
Naval Station Coronado, Long Beach Naval Station, 32nd Street Naval Station
and Camp Pendleton COST ENGINEER/SCHEDULER Kim Romero
served as a Cost Engineer and Scheduler for construction projects at the
Naval Marine facilities. Kim tracked cost and updated the schedule on a
weekly basis for environmental projects related to soil contamination
removal, construction of Vapor Extraction units, demolition of existing
buildings and removal of
underground storage tanks at Long Beach Naval Facility ($11 million), Camp
Pendleton ($15 million), North Island ($20 million), and 32nd Street Naval
Station ($11 million). He was responsible for cost loading schedules, man
power analysis; earn value analysis, tracking costs on a daily basis and
developing monthly cost burn rate, and prepared weekly and monthly schedule
and cost analysis reports. Kim also provided training for newly hired cost
engineers and schedulers.